{"id":"progress/2026-05-31/era-c-readiness-snapshot","relativePath":"progress/2026-05-31/era-c-readiness-snapshot.md","title":"Era C Readiness Snapshot (May 31, 2026)","markdown":"# Era C Readiness Snapshot (May 31, 2026)\n\nThis one-page snapshot captures the latest green evidence required to transition from Era B hardening to Era C planning.\n\n## Gateway Activation Decision (B7)\n\n- Decision: **Keep direct-adapter mode active** for now.\n- Reason: B7 readiness is implemented and `gatewayRecommended: true` is reported, but no immediate operational pressure requires forced activation today.\n- Owner: `@rsung`\n- Next review date: **August 31, 2026**\n\n## Evidence Links (Green)\n\n- Era B exit gate:\n  - `tests/quality/era-b-exit-gate.test.ts`\n- API protocol/profile conformance:\n  - `tests/quality/protocol-conformance.test.ts`\n- Provider protocol conformance:\n  - `tests/quality/provider-protocol-conformance.test.ts`\n- Linked Art B9 modeling guardrails:\n  - `tests/quality/linked-art-b9-guardrails.test.ts`\n- Validation drift trend (two-cycle no-regression gate):\n  - command: `pnpm validation:drift:trend`\n  - script: `scripts/validation-drift.ts`\n\n## Operational Notes\n\n- Auth credential rotation is recorded complete in the roadmap operational sign-off section.\n- This snapshot is the canonical reference for pre-Era-C operational sign-off completion as of May 31, 2026.\n","sections":[{"level":2,"heading":"Gateway Activation Decision (B7)","anchor":"gateway-activation-decision-b7"},{"level":2,"heading":"Evidence Links (Green)","anchor":"evidence-links-green"},{"level":2,"heading":"Operational Notes","anchor":"operational-notes"}],"html":"<h1 id=\"era-c-readiness-snapshot-may-31-2026\">Era C Readiness Snapshot (May 31, 2026)</h1>\n<p>This one-page snapshot captures the latest green evidence required to transition from Era B hardening to Era C planning.</p>\n<h2 id=\"gateway-activation-decision-b7\">Gateway Activation Decision (B7)</h2>\n<ul><li>Decision: <strong>Keep direct-adapter mode active</strong> for now.</li><li>Reason: B7 readiness is implemented and `gatewayRecommended: true` is reported, but no immediate operational pressure requires forced activation today.</li><li>Owner: `@rsung`</li><li>Next review date: <strong>August 31, 2026</strong></li></ul>\n<h2 id=\"evidence-links-green\">Evidence Links (Green)</h2>\n<ul><li>Era B exit gate:</li><li>`tests/quality/era-b-exit-gate.test.ts`</li><li>API protocol/profile conformance:</li><li>`tests/quality/protocol-conformance.test.ts`</li><li>Provider protocol conformance:</li><li>`tests/quality/provider-protocol-conformance.test.ts`</li><li>Linked Art B9 modeling guardrails:</li><li>`tests/quality/linked-art-b9-guardrails.test.ts`</li><li>Validation drift trend (two-cycle no-regression gate):</li><li>command: `pnpm validation:drift:trend`</li><li>script: `scripts/validation-drift.ts`</li></ul>\n<h2 id=\"operational-notes\">Operational Notes</h2>\n<ul><li>Auth credential rotation is recorded complete in the roadmap operational sign-off section.</li><li>This snapshot is the canonical reference for pre-Era-C operational sign-off completion as of May 31, 2026.</li></ul>","updatedAt":"2018-10-20T01:46:40.000Z","checksum":"9672614ceb5335dc4484a8ddc9bfceb028b2d805ce597d5b01635fcbfee5fda3","checksumPrefix":"9672614ceb53","anchorCount":3,"lineCount":30,"rawUrl":"/api/docs/content?path=progress%2F2026-05-31%2Fera-c-readiness-snapshot.md","htmlUrl":"/docs?doc=progress%2F2026-05-31%2Fera-c-readiness-snapshot.md","apiUrl":"/api/docs/content?path=progress%2F2026-05-31%2Fera-c-readiness-snapshot.md"}